工程造價專業英語第二

發布時間: 2020-11-22 00:38:36

A. 英語對工程造價專業的用處

1、幫助你拓寬視野,能夠獨立、實時地學習西方先進的工程造價管理經驗。
2、隨著與國際接軌,無論是在國外工作,還是在國內外企工作均具優勢。
3、有助於在國際工程招投標工作中進行良好的投標造價或造價控制。
4、當然,學了工程造價專業英語,同時也有助於提高你的整體英語水平。
5、總之,做什麼事情都有可能錯,學習永遠沒錯。

B. "工程造價專業"的英語怎麼說

project cost

C. 以工程造價專業為話題寫一篇英語作文

一看就是畢業論文~!!!!
Engineering cost management
Project cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction investment decision-making with design phase, whereas in the investment decision is made, the key lies in designing. According to expert analysis: architectural design, in the preliminary design stage, design stage, construction design stage to the engineering effect were 75% ~ 95%, 35% ~ 75%, 5% ~ 35%; while in the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort.
Pay attention to the technical and economic optimization combination. The combination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the outcome of the economy are not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, comparative study and effect evaluation, correct processing of advanced technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology.
Carry out "limitation is designed" method. To be consciously put the application of value engineering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This "limitation is designed" to effectively control the project cost. In order to make the "limitation is designed" to achieve the desired objectives, should be involved in the design personnel must be experienced skilled economic designer. Their design results must be practical, advanced and reasonable cost. Control of engineering cost on the other hand is the need for comparison, because the outcome is a process of graal improvement, and not to decide, so the comparison is a measure of its practical, advanced and economical means.
Do good project cost control in the process. ( 1) compilation of economic and feasible construction scheme. Before construction, construction enterprises should be combined with the construction drawings and the actual situation at the scene, their mechanical equipment, construction experience, the management level and technical specification acceptance criteria, a set of practical and feasible construction scheme. The construction scheme is engineering implementation of the programme of action. ( 2) to technical personnel, materials, machinery and personnel staff communication and coordination. In the process of construction, construction technology, materials and mechanical personnel should cooperate closely, understand each other, to management as the core, to rece costs for the purpose of. ( 3) to the project completion settlement. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
To establish and perfect the independent project cost advisory body, cultivate a Zhi De have both engineering team. To establish a real sense of independent engineering cost consulting agencies. Through improving the laws and regulations, normative behavior, separate government functions from enterprise management, the establishment of independent business partnership, share-holding system, the limited responsibility system and other forms of organization, an instry-based, diversified services integrated project consulting company, build and development and reform the engineering cost intermediary service institutions, make construction project management of a graal transition by an independent specialized agency in charge of project cost whole process tracking management, truly between owner and contractor plays an intermediary role. To strengthen engineering cost consulting instry association construction, establish project cost consulting instry self-discipline mechanism, and constantly improve the Engineering Cost Association in engineering cost consulting instry status, to be truly representative of the interests of the majority of the instry practitioners, government and enterprises to become connection link and the bridge. At the same time to strengthen the project cost specialty in higher ecation and in service ecation. As a result of project cost management in construction projects and various economic interests are closely related, and the whole social economic activities play a very important role, it requires the cost engineering technical personnel should have different levels of knowledge, in addition to their professional knowledge and have a deep understanding, also deal with the design content, design process, construction technology, project management, economic laws and regulations have a comprehensive understanding of. Therefore, the project cost management, project cost per unit of society groups, has already obtained a cost engineer qualification personnel, in order to carry out plan, has the goal, multiple levels of continuing ecation and training, to understand and master Chinese bilateral agreements with countries project cost technology, regulations, management system and its development trend, to expand domestic and foreign exchanges, and actively participate in international or regional engineering activities, improve their professional quality, so that the current practitioners in intelligent
structure, theory and working experience three aspects can meet the needs of engineering cost management. Cost engineering professionals need to strengthen their own learning, in addition to the professional knowledge to upgrade, should also work in combination with a broad understanding and master the relevant engineering and technical expertise, ecational organizations and instry regulatory bodies constitute a complete ecation system, so as to the field of engineering senior talent development to create good conditions.

D. 求一些工程造價專業英語詞彙短語的翻譯

不同的語境有不同的確選擇

土木工程 Civil Engineering
平面布置圖 plane layout diagram,floor plan
立面圖 elevational drawing
工程進度款 progress payment
質量控制 quality control
合同期限 contract term
工程利潤 Project profit
施工合同 construction contract
施工驗收技術規范 technical code for work and acceptance
造價師 Moderator 國家注冊造價工程師 national registered cost Engineers

工程合同總造價 total contract sum
合同文件 contract documents
材料規格 specification for materials
施工現場 construction site
承包商的資格預審 prequalification of Contract business
工程管理 working management
項目規劃設計和施工 project plan
投標和合同授予過程
質量保證期 quality assurance date
不符合規格 failed to come up to specifications
政府機構 government organization

E. 我是工程造價專業的學生 急需以下課程名稱的英文翻譯

Situation and Policies ecation, computer programming based VF, cost English, engineering bill pricing, economic law and contract management, project risks and management contracts, project management, installation works over the budget, financial management, real estate valuation, municipal works, Principles of management, systems engineering, fixed principle and Budget, technical economics, construction projects over the budget, construction machinery, operations research, foundation and the foundation, construction equipment engineering, construction supervision Studies, construction design, construction economics, housing construction Xue, building regulations, management, psychology, lawyer system and practice, read financial reports of listed companies

F. 急求!工程造價咨詢這個專業用詞用英語怎麼翻譯

engineering budgeting
http://www.xgmecc.com/jianjie.asp

construction cost consulting
http://www.dlxinde.com/

G. 土木工程, 和工程造價這兩個專業的英文是啥

土木工程
Civil Engineering

工程造價
Construction Cost

H. 工程造價專業這個詞有沒有專門的英語翻譯啊

工程造價
engineering cost
工程造價專業
the major of engineering cost

I. 工程造價專業,英語不好,關於出國讀研的問題

就你目前的英語水平,要申到美國差不多的大學的研究生,還是比較困難的。建議申請加拿大的英屬哥倫比亞大學的工程與項目管理研究生,英屬哥倫比亞大學此專業北美地區很有名,學校世界排名三十左右,是一所很好的大學。學校地處溫哥華,氣候宜人,華人聚集。如果有可能,找個外教,好好練練口語和聽力。

熱點內容
幼師專業怎麼樣 發布:2021-03-16 21:42:13 瀏覽:24
音樂小毛驢故事 發布:2021-03-16 21:40:57 瀏覽:196
昂立中學生教育閘北 發布:2021-03-16 21:40:47 瀏覽:568
建築業一建報考條件 發布:2021-03-16 21:39:53 瀏覽:666
2017年教師資格注冊結果 發布:2021-03-16 21:39:49 瀏覽:642
中國教師資格證查分 發布:2021-03-16 21:39:41 瀏覽:133
踵什麼成語有哪些 發布:2021-03-16 21:38:20 瀏覽:962
東營幼師專業學校 發布:2021-03-16 21:35:26 瀏覽:467
機械電子研究生課程 發布:2021-03-16 21:33:36 瀏覽:875
杭州朝日教育培訓中心怎麼樣 發布:2021-03-16 21:33:28 瀏覽:238