工程造价专业英语
⑴ 英语对工程造价专业的用处
1、帮助你拓宽视野,能够独立、实时地学习西方先进的工程造价管理经验。
2、随着与国际接轨,无论是在国外工作,还是在国内外企工作均具优势。
3、有助于在国际工程招投标工作中进行良好的投标造价或造价控制。
4、当然,学了工程造价专业英语,同时也有助于提高你的整体英语水平。
5、总之,做什么事情都有可能错,学习永远没错。
⑵ 我是工程造价专业的学生 急需以下课程名称的英文翻译
Situation and Policies ecation, computer programming based VF, cost English, engineering bill pricing, economic law and contract management, project risks and management contracts, project management, installation works over the budget, financial management, real estate valuation, municipal works, Principles of management, systems engineering, fixed principle and Budget, technical economics, construction projects over the budget, construction machinery, operations research, foundation and the foundation, construction equipment engineering, construction supervision Studies, construction design, construction economics, housing construction Xue, building regulations, management, psychology, lawyer system and practice, read financial reports of listed companies
⑶ 用英语写一封关于工程造价专业的求职信
P.O. Box 36
Tsinghua University
Beijing,China 100084
Dear Sir/Madam:
Your advertisement for a Network Maintenance Engineer in the April 10 Student Daily interested me bacause the position that you described sounds exactly like the kind of job I am seeking.
According to the advertisement ,your position requires top university,Bachelor or above in Computer Science or equivalent field and proficient in Windows NT4.0 and LINUX System. I feel that I am competent to meet the requirements. I will be graating from Graate School of Tsinghua University this year with a M.S. degree . My studies have included courses in computer control and management and I designed a control simulation system developed with Microsoft Visual InterDev and SQL Server.
During my ecation, I have grasped the principals of my major and skills of practice. Not only have I passed CET-6, but more important I can communicate with others freely in English. My ability to write and speak English is out of question.
I would appreciate your time in reviewing my enclosed resume and if there is any additional information you require, please contact me.I would welcome an opportunity to meet with you for a personal interview.
With many thanks,
Wang Lin
⑷ 土木工程造价专业英语第四版课后练习翻译
LESSON 4 2、Translate the following phrases into Chinese /English . (1)Sustained load 长期荷载 (2)Cement gel 水泥凝胶体
(3)Water-cement ratio 水灰比 (4)The stability of the structure结构稳定 (5)The expansion joint 伸缩缝 (6)Moisture content 含水量 (7)Cement paste 水泥浆
(8)The coefficient of thermal expansion of concrete 混凝土热膨胀系 (9)Permanent plastic strain 永久塑性应变 (10)The fatigue strength of concrete 混凝土疲劳强度 3、Translate the following sentence into Chinese.
(1)The cause of the volume changes in concrete can be attributed to changes in moisture content, chemical reaction of the cement with water, variation in temperature, and applied loads. 混凝土的体积变化的原因可以归结为水分含量,水泥和水的化学反应,温度以及施加荷载的变化。 (2)High-early-strength and low-heat cement show more shrinkage than normal Portland cement. 高早强和低热水泥显示超过普通硅酸盐水泥收缩。
(3)The greater the aggregate content, the smaller is the shrinkage. 骨料含量越大,收缩越小。
(4)Therefore, cracks may develop in concrete when a high percentage of steel is used. 因此,当使用高比例的钢铁时将可能产生混凝土裂缝。
(5)Generally, concrete shrinks at a high rate ring the initial period of hardening, but at later stages the rate diminishes graally.
一般来说,在硬化过程中初期率很高,但在稍后阶段混凝土收缩率逐渐减小。
(6)Under sustained load, plastic deformation continues to develop over a period that may last for years.
持续负荷下,塑性变形继续发展一段时间,可能持续数年。
(7)Creep increases with an increase of stress in specimens made from concrete of the same strength and with the same ration of load.
与标本中增加的压力增大制成的蠕变相同强度混凝土和时间相同的负载 与标本中的压力相同强度的混凝土,并与负荷增加同一时间作出蠕变增加 (8)Creep is reced with an increase in the humidity of the ambient air 蠕变的减少是由于在周围的空气湿度增加
(9) Creep is decreases with an increase in the size of the tested specimen. 蠕变是一个经过测试的试件尺寸增大而减小.
(10)High-temperature steam curing of concrete as well as per use of a plasticizer will rece the amount of creep.
高温蒸汽作为增塑剂正确使用混凝土养护将减少蠕变量. 5、Translate the following sentence into English.
(1)如果通过蒸发失去水分,混凝土就会收缩,但在水中硬化则会膨胀。
If it loses moisture(水份) by evaporation(蒸发),concrete shrinks, but if the concrete hardens in water, it expands.
(2)影响混凝土收缩的因素很多,如水泥和水的含量、骨料的级配以及环境条件等。
Many factors influence the shrinkage of concrete such as cement and water content、 gradation(等级) of aggregate and ambient conditions and so on。 (3)混凝土拌合物中的水泥含量越多或含水量越多,收缩量则越大。
The more cement or water content in the concrete mix, the greater the shrinkage.
⑸ 工程造价专业,英语不好,关于出国读研的问题
就你目前的英语水平,要申到美国差不多的大学的研究生,还是比较困难的。建议申请加拿大的英属哥伦比亚大学的工程与项目管理研究生,英属哥伦比亚大学此专业北美地区很有名,学校世界排名三十左右,是一所很好的大学。学校地处温哥华,气候宜人,华人聚集。如果有可能,找个外教,好好练练口语和听力。
⑹ 以工程造价专业为话题写一篇英语作文
一看就是毕业论文~!!!!
Engineering cost management
Project cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction investment decision-making with design phase, whereas in the investment decision is made, the key lies in designing. According to expert analysis: architectural design, in the preliminary design stage, design stage, construction design stage to the engineering effect were 75% ~ 95%, 35% ~ 75%, 5% ~ 35%; while in the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort.
Pay attention to the technical and economic optimization combination. The combination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the outcome of the economy are not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, comparative study and effect evaluation, correct processing of advanced technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology.
Carry out "limitation is designed" method. To be consciously put the application of value engineering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This "limitation is designed" to effectively control the project cost. In order to make the "limitation is designed" to achieve the desired objectives, should be involved in the design personnel must be experienced skilled economic designer. Their design results must be practical, advanced and reasonable cost. Control of engineering cost on the other hand is the need for comparison, because the outcome is a process of graal improvement, and not to decide, so the comparison is a measure of its practical, advanced and economical means.
Do good project cost control in the process. ( 1) compilation of economic and feasible construction scheme. Before construction, construction enterprises should be combined with the construction drawings and the actual situation at the scene, their mechanical equipment, construction experience, the management level and technical specification acceptance criteria, a set of practical and feasible construction scheme. The construction scheme is engineering implementation of the programme of action. ( 2) to technical personnel, materials, machinery and personnel staff communication and coordination. In the process of construction, construction technology, materials and mechanical personnel should cooperate closely, understand each other, to management as the core, to rece costs for the purpose of. ( 3) to the project completion settlement. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
To establish and perfect the independent project cost advisory body, cultivate a Zhi De have both engineering team. To establish a real sense of independent engineering cost consulting agencies. Through improving the laws and regulations, normative behavior, separate government functions from enterprise management, the establishment of independent business partnership, share-holding system, the limited responsibility system and other forms of organization, an instry-based, diversified services integrated project consulting company, build and development and reform the engineering cost intermediary service institutions, make construction project management of a graal transition by an independent specialized agency in charge of project cost whole process tracking management, truly between owner and contractor plays an intermediary role. To strengthen engineering cost consulting instry association construction, establish project cost consulting instry self-discipline mechanism, and constantly improve the Engineering Cost Association in engineering cost consulting instry status, to be truly representative of the interests of the majority of the instry practitioners, government and enterprises to become connection link and the bridge. At the same time to strengthen the project cost specialty in higher ecation and in service ecation. As a result of project cost management in construction projects and various economic interests are closely related, and the whole social economic activities play a very important role, it requires the cost engineering technical personnel should have different levels of knowledge, in addition to their professional knowledge and have a deep understanding, also deal with the design content, design process, construction technology, project management, economic laws and regulations have a comprehensive understanding of. Therefore, the project cost management, project cost per unit of society groups, has already obtained a cost engineer qualification personnel, in order to carry out plan, has the goal, multiple levels of continuing ecation and training, to understand and master Chinese bilateral agreements with countries project cost technology, regulations, management system and its development trend, to expand domestic and foreign exchanges, and actively participate in international or regional engineering activities, improve their professional quality, so that the current practitioners in intelligent
structure, theory and working experience three aspects can meet the needs of engineering cost management. Cost engineering professionals need to strengthen their own learning, in addition to the professional knowledge to upgrade, should also work in combination with a broad understanding and master the relevant engineering and technical expertise, ecational organizations and instry regulatory bodies constitute a complete ecation system, so as to the field of engineering senior talent development to create good conditions.
⑺ "工程造价专业"的英语怎么说
project cost
⑻ 工程造价专业考研英语考几,数学考几
这个不是确定的,需要看你报考的学校以及硕士类别,分为学术型和专业型,具体可以到报考学校的研究生院官方网站上找历年考研考试大纲以及专业目录考试要求等,里边有详细的介绍,望采纳,谢谢
⑼ 工程造价专业这个词有没有专门的英语翻译啊
工程造价
engineering cost
工程造价专业
the major of engineering cost