A. 英语对工程造价专业的用处
1、帮助你拓宽视野,能够独立、实时地学习西方先进的工程造价管理经验。
2、随着与国际接轨,无论是在国外工作,还是在国内外企工作均具优势。
3、有助于在国际工程招投标工作中进行良好的投标造价或造价控制。
4、当然,学了工程造价专业英语,同时也有助于提高你的整体英语水平。
5、总之,做什么事情都有可能错,学习永远没错。
B. "工程造价专业"的英语怎么说
project cost
C. 以工程造价专业为话题写一篇英语作文
一看就是毕业论文~!!!!
Engineering cost management
Project cost control emphasis should be transferred to the project construction early days, is transferred to the project decision and design stage. Project cost control in construction projects throughout the entire process, the key lies in the pre construction investment decision-making with design phase, whereas in the investment decision is made, the key lies in designing. According to expert analysis: architectural design, in the preliminary design stage, design stage, construction design stage to the engineering effect were 75% ~ 95%, 35% ~ 75%, 5% ~ 35%; while in the construction phase, through the optimization of construction organization design, construction cost saving the possibility of only 5% to 10%. We should put the focus shifted to the design stage, in order to get twice the result with half the effort.
Pay attention to the technical and economic optimization combination. The combination of technology with economy is most effective way to control engineering cost. China engineering fields for a long time did not do this. The lack of technical personnel economy idea, design thought is conservative, the design of the outcome of the economy are not fully reflect. Therefore, we should solve the problem is to improve economic efficiency as the goal, in the construction process, organization, technology and economy organic ground union rises. Through the economic analysis, comparative study and effect evaluation, correct processing of advanced technology and reasonable in economy between the relation of unity of opposites, strive to advanced technology under the conditions of economic rational, reasonable in economy based on advanced technology.
Carry out "limitation is designed" method. To be consciously put the application of value engineering to the specific design, actively promote quota design in engineering design contract, by way of bidding. This has been proven in practice is an effective way, it is not only an economic problem, more precisely a technical and economic problems. This "limitation is designed" to effectively control the project cost. In order to make the "limitation is designed" to achieve the desired objectives, should be involved in the design personnel must be experienced skilled economic designer. Their design results must be practical, advanced and reasonable cost. Control of engineering cost on the other hand is the need for comparison, because the outcome is a process of graal improvement, and not to decide, so the comparison is a measure of its practical, advanced and economical means.
Do good project cost control in the process. ( 1) compilation of economic and feasible construction scheme. Before construction, construction enterprises should be combined with the construction drawings and the actual situation at the scene, their mechanical equipment, construction experience, the management level and technical specification acceptance criteria, a set of practical and feasible construction scheme. The construction scheme is engineering implementation of the programme of action. ( 2) to technical personnel, materials, machinery and personnel staff communication and coordination. In the process of construction, construction technology, materials and mechanical personnel should cooperate closely, understand each other, to management as the core, to rece costs for the purpose of. ( 3) to the project completion settlement. Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
Strict supervision system. Control project cost effectively, in the early phase of the project shall be subject to supervision (including cost management ) system. Through analyzing the design process of supervision, make the design more reasonable, cost control to limit the scope of, accomplish truly with the smallest investment maximize output.
To establish and perfect the independent project cost advisory body, cultivate a Zhi De have both engineering team. To establish a real sense of independent engineering cost consulting agencies. Through improving the laws and regulations, normative behavior, separate government functions from enterprise management, the establishment of independent business partnership, share-holding system, the limited responsibility system and other forms of organization, an instry-based, diversified services integrated project consulting company, build and development and reform the engineering cost intermediary service institutions, make construction project management of a graal transition by an independent specialized agency in charge of project cost whole process tracking management, truly between owner and contractor plays an intermediary role. To strengthen engineering cost consulting instry association construction, establish project cost consulting instry self-discipline mechanism, and constantly improve the Engineering Cost Association in engineering cost consulting instry status, to be truly representative of the interests of the majority of the instry practitioners, government and enterprises to become connection link and the bridge. At the same time to strengthen the project cost specialty in higher ecation and in service ecation. As a result of project cost management in construction projects and various economic interests are closely related, and the whole social economic activities play a very important role, it requires the cost engineering technical personnel should have different levels of knowledge, in addition to their professional knowledge and have a deep understanding, also deal with the design content, design process, construction technology, project management, economic laws and regulations have a comprehensive understanding of. Therefore, the project cost management, project cost per unit of society groups, has already obtained a cost engineer qualification personnel, in order to carry out plan, has the goal, multiple levels of continuing ecation and training, to understand and master Chinese bilateral agreements with countries project cost technology, regulations, management system and its development trend, to expand domestic and foreign exchanges, and actively participate in international or regional engineering activities, improve their professional quality, so that the current practitioners in intelligent
structure, theory and working experience three aspects can meet the needs of engineering cost management. Cost engineering professionals need to strengthen their own learning, in addition to the professional knowledge to upgrade, should also work in combination with a broad understanding and master the relevant engineering and technical expertise, ecational organizations and instry regulatory bodies constitute a complete ecation system, so as to the field of engineering senior talent development to create good conditions.
D. 求一些工程造价专业英语词汇短语的翻译
不同的语境有不同的确选择
土木工程 Civil Engineering
平面布置图 plane layout diagram,floor plan
立面图 elevational drawing
工程进度款 progress payment
质量控制 quality control
合同期限 contract term
工程利润 Project profit
施工合同 construction contract
施工验收技术规范 technical code for work and acceptance
造价师 Moderator 国家注册造价工程师 national registered cost Engineers
工程合同总造价 total contract sum
合同文件 contract documents
材料规格 specification for materials
施工现场 construction site
承包商的资格预审 prequalification of Contract business
工程管理 working management
项目规划设计和施工 project plan
投标和合同授予过程
质量保证期 quality assurance date
不符合规格 failed to come up to specifications
政府机构 government organization
E. 我是工程造价专业的学生 急需以下课程名称的英文翻译
Situation and Policies ecation, computer programming based VF, cost English, engineering bill pricing, economic law and contract management, project risks and management contracts, project management, installation works over the budget, financial management, real estate valuation, municipal works, Principles of management, systems engineering, fixed principle and Budget, technical economics, construction projects over the budget, construction machinery, operations research, foundation and the foundation, construction equipment engineering, construction supervision Studies, construction design, construction economics, housing construction Xue, building regulations, management, psychology, lawyer system and practice, read financial reports of listed companies
F. 急求!工程造价咨询这个专业用词用英语怎么翻译
engineering budgeting
http://www.xgmecc.com/jianjie.asp
construction cost consulting
http://www.dlxinde.com/
G. 土木工程, 和工程造价这两个专业的英文是啥
土木工程
Civil Engineering
工程造价
Construction Cost
H. 工程造价专业这个词有没有专门的英语翻译啊
工程造价
engineering cost
工程造价专业
the major of engineering cost
I. 工程造价专业,英语不好,关于出国读研的问题
就你目前的英语水平,要申到美国差不多的大学的研究生,还是比较困难的。建议申请加拿大的英属哥伦比亚大学的工程与项目管理研究生,英属哥伦比亚大学此专业北美地区很有名,学校世界排名三十左右,是一所很好的大学。学校地处温哥华,气候宜人,华人聚集。如果有可能,找个外教,好好练练口语和听力。